ADS124S08EVM

Mfr. #: ADS124S08EVM
制造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS124S08 Evaluation Module
生命周期: 制造商新产品。
数据表: ADS124S08EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS124S08EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 3.3 V/5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.259984 oz of Unit Weight

ADS124S08EVM Image

ADS124S08EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS124S08EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS142S08
  • Operating Supply Voltage: 3.3 V/5 V
  • Description/Function: Evaluates the ADS142S08 delta-sigma ADC
  • Series: ADS124S08
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.259984 oz

ADS124S08EVM

ADS124S08EVM Specifications

ADS124S08EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V/5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.259984 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top