| Mfr. #: | ADS1263EVM-PDK |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Data Conversion IC Development Tools ADS1263 Performance Eval Kit |
| 生命周期: | 制造商新产品。 |
| 数据表: | ADS1263EVM-PDK 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 3.3 V, 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 11.534586 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1263EVM-PDK Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 3.3 V, 5 V.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed SPI, USB
A: At what frequency does the Product Type?
Q: The product Product Type is Data Conversion IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 11.534586 oz.