ADS42LB69EVM

Mfr. #: ADS42LB69EVM
制造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS42LB69EVM
生命周期: 制造商新产品。
数据表: ADS42LB69EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS42LB69EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 3.3 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Compatible with TSW1400EVM. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS42LB69EVM Image

ADS42LB69EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS42LB69EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS42LB69
  • Operating Supply Voltage: 3.3 V
  • Packaging: Bulk
  • Description/Function: ADS42LB69 evaluation module
  • Series: ADS42LB69
  • Brand: Texas Instruments
  • For Use With: TSW1400EVM
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS42LB69EVM

ADS42LB69EVM Specifications

ADS42LB69EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TSW1400EVM.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top