ADS54J40EVM

Mfr. #: ADS54J40EVM
制造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS54J40EVM
生命周期: 制造商新产品。
数据表: ADS54J40EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS54J40EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: JESD204B Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS54J40EVM Image

ADS54J40EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS54J40EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS54J40
  • Operating Supply Voltage: 5 V
  • Description/Function: ADS54J40 high speed, JESD204B interface ADCs
  • Series: ADS54J40
  • Brand: Texas Instruments
  • Interface Type: JESD204B
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS54J40EVM

ADS54J40EVM Specifications

ADS54J40EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is JESD204B.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top