ADS7853EVM-PDK

Mfr. #: ADS7853EVM-PDK
制造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS7853 Perf Dem Kit
生命周期: 制造商新产品。
数据表: ADS7853EVM-PDK 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7853EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Boards This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI Compatible with ADS7853. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS7853EVM-PDK Image

ADS7853EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7853EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Demonstration Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS7853
  • Operating Supply Voltage: 5 V
  • Description/Function: ADS7853 demonstration board for 14 bit, 1-MSPS single ended/psuedo-differential, SAR ADC
  • Series: ADS7853
  • Brand: Texas Instruments
  • Interface Type: I2C, SPI
  • For Use With: ADS7853
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS7853EVM-PDK

ADS7853EVM-PDK Specifications

ADS7853EVM-PDK FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Demonstration Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, SPI

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed ADS7853

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top