ADS7854EVM-PDK

Mfr. #: ADS7854EVM-PDK
制造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS7854 Perf Dem Kit
生命周期: 制造商新产品。
数据表: ADS7854EVM-PDK 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7854EVM-PDK Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Compatible with ADS7854. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS7854EVM-PDK Image

ADS7854EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7854EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS7854
  • Operating Supply Voltage: 5 V
  • Description/Function: ADS7854 evaluation module
  • Series: ADS7854
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • For Use With: ADS7854
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS7854EVM-PDK

ADS7854EVM-PDK Specifications

ADS7854EVM-PDK FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed SPI, USB

  • A: At what frequency does the For Use With?

    Q: The product For Use With is ADS7854.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top