ADS8363EVM

Mfr. #: ADS8363EVM
制造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS8363 Eval Mod
生命周期: 制造商新产品。
数据表: ADS8363EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8363EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS8363EVM Image

ADS8363EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8363EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS7263, ADS8363
  • Operating Supply Voltage: 5 V
  • Series: ADS8363
  • Brand: Texas Instruments
  • Interface Type: Serial
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS8363EVM

ADS8363EVM Specifications

ADS8363EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Serial.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top