ADS8568EVM-PDK

Mfr. #: ADS8568EVM-PDK
制造商: Texas Instruments
描述: Data Conversion IC Development Tools ADS8568 Perf Dem Kit
生命周期: 制造商新产品。
数据表: ADS8568EVM-PDK 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8568EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Boards This device belongs to the ADC and DAC type. 15 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS8568EVM-PDK Image

ADS8568EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8568EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Demonstration Boards
  • Type: ADC and DAC
  • Tool Is For Evaluation Of: ADS8568
  • Operating Supply Voltage: 15 V
  • Series: ADS8568
  • Brand: Texas Instruments
  • Interface Type: Serial
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS8568EVM-PDK

ADS8568EVM-PDK Specifications

ADS8568EVM-PDK FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Demonstration Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC and DAC

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 15 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed Serial

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top