AIC111EVM

Mfr. #: AIC111EVM
制造商: Texas Instruments
描述: Data Conversion IC Development Tools AIC111 Eval Mod
生命周期: 制造商新产品。
数据表: AIC111EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AIC111EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 3.3 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

AIC111EVM Image

AIC111EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AIC111EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: AIC111
  • Operating Supply Voltage: 3.3 V to 5 V
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

AIC111EVM

AIC111EVM Specifications

AIC111EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V to 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top