BQ24616EVM

Mfr. #: BQ24616EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools Eval Mod for BQ24616
生命周期: 制造商新产品。
数据表: BQ24616EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24616EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 24 V Input Voltage Output Voltage is 21 V Output current: 8 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24616EVM Image

BQ24616EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24616EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24616
  • Input Voltage: 24 V
  • Output Voltage: 21 V
  • Description/Function: The bq24616 is highly integrated Li-ion or Li-polymer switch-mode battery charge controller
  • Output Current: 8 A
  • Series: BQ24616
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24616EVM

BQ24616EVM Specifications

BQ24616EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 24 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 21 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 8 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top