BQ24617EVM

Mfr. #: BQ24617EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools Eval Mod for BQ24617
生命周期: 制造商新产品。
数据表: BQ24617EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24617EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 5 V to 24 V Input Voltage Output Voltage is 21 V Output current: 3 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24617EVM Image

BQ24617EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24617EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24617
  • Input Voltage: 5 V to 24 V
  • Output Voltage: 21 V
  • Description/Function: Li-polymer switch-mode battery charge controllers
  • Output Current: 3 A
  • Series: BQ24617
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24617EVM

BQ24617EVM Specifications

BQ24617EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5 V to 24 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 21 V

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 3 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top