BQ27520EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 3.6 V Input Voltage Bulk packaging for easy dispensing Output current: 1 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with EV2300. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ27520EVM Image

BQ27520EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ27520EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ27520
  • Input Voltage: 3.6 V
  • Packaging: Bulk
  • Description/Function: The EVM includes one bq27520 circuit module, a current sense resistor, one thermistor, an EV2300 PC interface board for gas gauge interface and a PC USB cable
  • Output Current: 1 A
  • Series: BQ27520
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: EV2300
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ27520EVM

BQ27520EVM Specifications

BQ27520EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 3.6 V

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 1 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is EV2300.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.