| Mfr. #: | BQ27GDK000EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools Evaluation Module |
| 生命周期: | 制造商新产品。 |
| 数据表: | BQ27GDK000EVM 数据表 |


This product is manufactured by Texas Instruments. Development Kits This device belongs to the Battery Management type. 6 V Input Voltage Output Voltage is 1.8 V Bulk packaging for easy dispensing Output current: 2 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.298549 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ27GDK000EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Development Kits.
A: At what frequency does the Type?
Q: The product Type is Battery Management.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 6 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 1.8 V.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the Output Current of the product?
Q: The Output Current of the product is 2 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is I2C.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.298549 oz.