| Mfr. #: | BQ76920EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools Evaluation Module |
| 生命周期: | 制造商新产品。 |
| 数据表: | BQ76920EVM 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 25 V Input Voltage Output Voltage is 2.5 V Dimensions of 4.805 in x 4 in Output current: 15 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Compatible with BQ76920. The product can operate at a maximum temperature of + 30 C. The minimum operating temperature of this product is + 20 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.671409 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ76920EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Battery Management
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 25 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 2.5 V.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 4.805 in x 4 in.
A: At what frequency does the Output Current?
Q: The product Output Current is 15 A.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed I2C, USB
A: At what frequency does the For Use With?
Q: The product For Use With is BQ76920.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 30 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is + 20 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.671409 oz