| Mfr. #: | BQ76940EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools Evaluation Module |
| 生命周期: | 制造商新产品。 |
| 数据表: | BQ76940EVM 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 66 V Input Voltage Output Voltage is 2.5 V/3.3 V Output current: 15 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C The product can operate at a maximum temperature of + 30 C. The minimum operating temperature of this product is + 20 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.245557 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ76940EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Battery Management.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 66 V
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 2.5 V/3.3 V.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 15 A
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is I2C.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 30 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is + 20 C.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.245557 oz.