CDC3S04EVM

Mfr. #: CDC3S04EVM
制造商: Texas Instruments
描述: Clock & Timer Development Tools CDC3S04EVM Eval Mod
生命周期: 制造商新产品。
数据表: CDC3S04EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDC3S04EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Clock Buffers type. Frequency range: 52 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: I2C The minimum operating temperature of this product is - 30 C. 2.2 V to 3.6 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDC3S04EVM Image

CDC3S04EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDC3S04EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Clock Buffers
  • Tool Is For Evaluation Of: CDC3S04
  • Frequency: 52 MHz
  • Series: CDC3S04
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Minimum Operating Temperature: - 30 C
  • Operating Supply Voltage: 2.2 V to 3.6 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDC3S04EVM

CDC3S04EVM Specifications

CDC3S04EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Buffers

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 52 MHz.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 30 C

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.2 V to 3.6 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Clock & Timer Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top