DAC3151EVM

Mfr. #: DAC3151EVM
制造商: Texas Instruments
描述: Data Conversion IC Development Tools DAC3151EVM
生命周期: 制造商新产品。
数据表: DAC3151EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC3151EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the DAC type. 1.8 V, 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Parallel LVDS Compatible with TSW1400, DAC3151. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

DAC3151EVM Image

DAC3151EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC3151EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: DAC
  • Tool Is For Evaluation Of: DAC31x1
  • Operating Supply Voltage: 1.8 V, 3.3 V
  • Description/Function: DAC3151 Evaluation Module
  • Series: DAC3151
  • Brand: Texas Instruments
  • Interface Type: Parallel LVDS
  • For Use With: TSW1400, DAC3151
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DAC3151EVM

DAC3151EVM Specifications

DAC3151EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 1.8 V, 3.3 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Parallel LVDS.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TSW1400, DAC3151

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top