| Mfr. #: | DRV10964EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools DRV10964EVM |
| 生命周期: | 制造商新产品。 |
| 数据表: | DRV10964EVM 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 2.1 V to 5.5 V Input Voltage Output Voltage is 7.5 V Output current: 500 mA Texas Instruments is a trusted brand for quality electronics Compatible with TLC555. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.105920 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV10964EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is Motor / Motion Controllers & Drivers.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 2.1 V to 5.5 V.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 7.5 V.
A: What is the Output Current of the product?
Q: The Output Current of the product is 500 mA.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the For Use With of the product?
Q: The For Use With of the product is TLC555.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.105920 oz