DRV10983Q1EVM

Mfr. #: DRV10983Q1EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools DRV10983Q1EVM
生命周期: 制造商新产品。
数据表: DRV10983Q1EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV10983Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 6 V to 28 V Input Voltage Output Voltage is - Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV10983Q1EVM Image

DRV10983Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV10983Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV10983-Q1
  • Input Voltage: 6 V to 28 V
  • Output Voltage: -
  • Description/Function: Evaluates the DRV10983-Q1 three-phase sensorless BLDC motor drivers
  • Series: DRV10983-Q1
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV10983Q1EVM

DRV10983Q1EVM Specifications

DRV10983Q1EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 6 V to 28 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is -.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, USB

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top