| Mfr. #: | DRV201EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools DRV201EVM |
| 生命周期: | 制造商新产品。 |
| 数据表: | DRV201EVM 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 2.5 V to 4.8 V Input Voltage Output Voltage is - Output current: 102.3 mA Texas Instruments is a trusted brand for quality electronics Interface Type: I2C The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV201EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Motor / Motion Controllers & Drivers.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 2.5 V to 4.8 V
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is -.
A: At what frequency does the Output Current?
Q: The product Output Current is 102.3 mA.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is I2C.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 85 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.