DRV5055EVM

Mfr. #: DRV5055EVM
制造商: Texas Instruments
描述: Magnetic Sensor Development Tools DRV5055EVM
生命周期: 制造商新产品。
数据表: DRV5055EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV5055EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Hall Effect Sensor type. 3 V to 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Magnetic Sensor Development Tools product type 1 of 100 Development Tools as subcategory

DRV5055EVM Image

DRV5055EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV5055EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Magnetic Sensor Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Hall Effect Sensor
  • Tool Is For Evaluation Of: DRV5055
  • Operating Supply Voltage: 3 V to 5.5 V
  • Series: DRV5055
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Magnetic Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV5055EVM

DRV5055EVM Specifications

DRV5055EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Hall Effect Sensor.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3 V to 5.5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Magnetic Sensor Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

16 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top