DRV8303EVM

Mfr. #: DRV8303EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools DRV8303 EVAL MOD
生命周期: 制造商新产品。
数据表: DRV8303EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8303EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 8 V to 60 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with CCStudio v5.x, XDS100 JTAG Emulator. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8303EVM Image

DRV8303EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8303EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV8303
  • Input Voltage: 8 V to 60 V
  • Description/Function: Evaluation module for three phase pre-driver with dual current shunt amplifiers
  • Series: DRV8303
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: CCStudio v5.x, XDS100 JTAG Emulator
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8303EVM

DRV8303EVM Specifications

DRV8303EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 8 V to 60 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed CCStudio v5.x, XDS100 JTAG Emulator

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top