DRV8703-Q1EVM

Mfr. #: DRV8703-Q1EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools DRV8703-Q1EVM
生命周期: 制造商新产品。
数据表: DRV8703-Q1EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8703-Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Gate Drivers type. 5.9 V to 45 V Input Voltage The AEC-Q100 Qualification Texas Instruments is a trusted brand for quality electronics Interface Type: UART, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8703-Q1EVM Image

DRV8703-Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8703-Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Gate Drivers
  • Tool Is For Evaluation Of: DRV8703-Q1
  • Input Voltage: 5.9 V to 45 V
  • Qualification: AEC-Q100
  • Description/Function: Evaluates the DRV8703-Q1 H-bridge gate driver
  • Series: DRV8703-Q1
  • Brand: Texas Instruments
  • Interface Type: UART, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8703-Q1EVM

DRV8703-Q1EVM Specifications

DRV8703-Q1EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Gate Drivers.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 5.9 V to 45 V

  • A: What is the Qualification of the product?

    Q: The Qualification of the product is AEC-Q100.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is UART, USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top