| Mfr. #: | DRV8844EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools DRV8844 Eval Mod |
| 生命周期: | 制造商新产品。 |
| 数据表: | DRV8844EVM 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 8 V to 60 V Input Voltage Output current: 3.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with DRV8844. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8844EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Power Management Specialized
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 8 V to 60 V.
A: At what frequency does the Output Current?
Q: The product Output Current is 3.5 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is USB.
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed DRV8844
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 85 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools