EM1402EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 70 V Input Voltage Output Voltage is 5 V Dimensions of 5.5 in x 3.75 in Texas Instruments is a trusted brand for quality electronics Interface Type: UART The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

EM1402EVM Image

EM1402EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

EM1402EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: bq76PL455A-Q1
  • Input Voltage: 70 V
  • Output Voltage: 5 V
  • Dimensions: 5.5 in x 3.75 in
  • Series: EM1402
  • Brand: Texas Instruments
  • Interface Type: UART
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

EM1402EVM

EM1402EVM Specifications

EM1402EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 70 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 5 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 5.5 in x 3.75 in

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is UART.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额