INA1650EVM

Mfr. #: INA1650EVM
制造商: Texas Instruments
描述: Audio IC Development Tools EVM
生命周期: 制造商新产品。
数据表: INA1650EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA1650EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Receiver type. 15 V operating supply voltage range Dimensions of Evaluation module for INA1650 audio line receiver Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

INA1650EVM Image

INA1650EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA1650EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Audio Receiver
  • Tool Is For Evaluation Of: INA1650
  • Operating Supply Voltage: 15 V
  • Dimensions: Evaluation module for INA1650 audio line receiver
  • Series: INA1650
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

INA1650EVM

INA1650EVM Specifications

INA1650EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Audio Receiver.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 15 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed Evaluation module for INA1650 audio line receiver

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top