| Mfr. #: | INA4180-4181EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Amplifier IC Development Tools EVM FOR INA418X FAMILY |
| 生命周期: | 制造商新产品。 |
| 数据表: | INA4180-4181EVM 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Current Sense type. 2.7 V to 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA4180-4181EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Current Sense.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 2.7 V to 5.5 V.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Product Type?
Q: The product Product Type is Amplifier IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.