| Mfr. #: | LM5145EVM-HD-20A |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools LM5145 HIGH DENSITY 20A EVM |
| 生命周期: | 制造商新产品。 |
| 数据表: | LM5145EVM-HD-20A 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 24 V to 72 V Input Voltage Output Voltage is 5 V Dimensions of 50 mm x 30 mm Output current: 20 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.250795 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM5145EVM-HD-20A Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is Switching Controllers.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 24 V to 72 V
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 5 V.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 50 mm x 30 mm.
A: What is the Output Current of the product?
Q: The Output Current of the product is 20 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 125 C.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.250795 oz