| Mfr. #: | LM5166EVM-C50A |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Power Management IC Development Tools LM5166EVM-C50A 500MA |
| 生命周期: | 制造商新产品。 |
| 数据表: | LM5166EVM-C50A 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 3 V to 65 V Input Voltage Output Voltage is 5 V Output current: 500 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM5166EVM-C50A Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 3 V to 65 V.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 5 V.
A: What is the Output Current of the product?
Q: The Output Current of the product is 500 mA.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.