LM76002EVM-500K

Mfr. #: LM76002EVM-500K
制造商: Texas Instruments
描述: Power Management IC Development Tools LM76002EVM-500K
生命周期: 制造商新产品。
数据表: LM76002EVM-500K 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM76002EVM-500K Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 3.5 V to 60 V Input Voltage Output Voltage is 3.3 V Output current: 2.5 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LM76002EVM-500K Image

LM76002EVM-500K

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM76002EVM-500K Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LM76002
  • Input Voltage: 3.5 V to 60 V
  • Output Voltage: 3.3 V
  • Output Current: 2.5 A
  • Series: LM76002
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LM76002EVM-500K

LM76002EVM-500K Specifications

LM76002EVM-500K FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 3.5 V to 60 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 2.5 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top