LMP91000EVM/NOPB

Mfr. #: LMP91000EVM/NOPB
制造商: Texas Instruments
描述: Data Conversion IC Development Tools EVAL BD LMP91000
生命周期: 制造商新产品。
数据表: LMP91000EVM/NOPB 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMP91000EVM/NOPB Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.033296 oz of Unit Weight

LMP91000EVM/NOPB Image

LMP91000EVM/NOPB

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMP91000EVM/NOPB Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: Y
  • Tool Is For Evaluation Of: LMP91000
  • Series: LMP91000
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.033296 oz

LMP91000EVM/NOPB

LMP91000EVM/NOPB Specifications

LMP91000EVM/NOPB FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.033296 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top