LMX2594EVM

Mfr. #: LMX2594EVM
制造商: Texas Instruments
描述: Clock & Timer Development Tools LMX2594EVM
生命周期: 制造商新产品。
数据表: LMX2594EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMX2594EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PLL Synthesizers / Multipliers / Dividers type. Frequency range: 15 GHz Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB 3.3 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

LMX2594EVM Image

LMX2594EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMX2594EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: PLL Synthesizers / Multipliers / Dividers
  • Tool Is For Evaluation Of: LMX2594
  • Frequency: 15 GHz
  • Series: LMX2594
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • Operating Supply Voltage: 3.3 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LMX2594EVM

LMX2594EVM Specifications

LMX2594EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is PLL Synthesizers / Multipliers / Dividers.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 15 GHz.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI, USB.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Clock & Timer Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

42 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top