LP5910DRV18EVM

Mfr. #: LP5910DRV18EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools LP5910DRV18EVM
生命周期: 制造商新产品。
数据表: LP5910DRV18EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP5910DRV18EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 2.3 V to 3.3 V Input Voltage Output Voltage is 1.8 V Output current: 300 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.170111 oz of Unit Weight

LP5910DRV18EVM Image

LP5910DRV18EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP5910DRV18EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: LP5910-1.8DRVR
  • Input Voltage: 2.3 V to 3.3 V
  • Output Voltage: 1.8 V
  • Description/Function: Ultra low noise, 300 mA linear Regulator evaluation module
  • Output Current: 300 mA
  • Series: LP5910
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.170111 oz

LP5910DRV18EVM

LP5910DRV18EVM Specifications

LP5910DRV18EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is LDO Voltage Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 2.3 V to 3.3 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.8 V

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 300 mA.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.170111 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top