MRD2EVM

Mfr. #: MRD2EVM
制造商: Texas Instruments
描述: RFID Transponder Tools Microreader EVAL BRD
生命周期: 制造商新产品。
数据表: MRD2EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
MRD2EVM Overview

This product is manufactured by Texas Instruments. Evaluation Kits 2.7 V to 5.5 V operating supply voltage range Frequency range: 134.2 kHz Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, RS232, USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. RFID Transponder Tools product type 1 of 100 Development Tools as subcategory

MRD2EVM Image

MRD2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

MRD2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RFID Transponder Tools
  • RoHS: Y
  • Product: Evaluation Kits
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Description/Function: RFID Evaluation Kit
  • Frequency: 134.2 kHz
  • Brand: Texas Instruments
  • Interface Type: SPI, RS232, USB
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: RFID Transponder Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

MRD2EVM

MRD2EVM Specifications

MRD2EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.7 V to 5.5 V.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 134.2 kHz.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI, RS232, USB.

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 85 C

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is RFID Transponder Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

21 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top