PCM2903EVM-U

Mfr. #: PCM2903EVM-U
制造商: Texas Instruments
描述: Audio IC Development Tools PCM2903 Eval Mod
生命周期: 制造商新产品。
数据表: PCM2903EVM-U 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM2903EVM-U Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

PCM2903EVM-U Image

PCM2903EVM-U

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM2903EVM-U Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Audio
  • Tool Is For Evaluation Of: PCM2903
  • Operating Supply Voltage: 5 V
  • Description/Function: PCM2903 evaluation module
  • Series: PCM2903
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

PCM2903EVM-U

PCM2903EVM-U Specifications

PCM2903EVM-U FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Audio.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top