SM72295EVM

Mfr. #: SM72295EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools SM72295EVM
生命周期: 制造商新产品。
数据表: SM72295EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
SM72295EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Gate Drivers type. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.291419 oz of Unit Weight

SM72295EVM Image

SM72295EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

SM72295EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Gate Drivers
  • Tool Is For Evaluation Of: SM72295
  • Description/Function: SM72295 full bridge gate driver with integrated current sense amplifier evaluation module
  • Series: SM72295
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.291419 oz

SM72295EVM

SM72295EVM Specifications

SM72295EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Gate Drivers.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.291419 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top