TAS5162DKD6EVM

Mfr. #: TAS5162DKD6EVM
制造商: Texas Instruments
描述: Audio IC Development Tools TAS5162DKD6EVM
生命周期: 制造商新产品。
数据表: TAS5162DKD6EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5162DKD6EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TAS5162DKD6EVM Image

TAS5162DKD6EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5162DKD6EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS5518, TAS5162
  • Series: TAS5162DKD6
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TAS5162DKD6EVM

TAS5162DKD6EVM Specifications

TAS5162DKD6EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top