THS6062EVM

Mfr. #: THS6062EVM
制造商: Texas Instruments
描述: Other Development Tools THS6062 Eval Mod
生命周期: 制造商新产品。
数据表: THS6062EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS6062EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Driver/Receiver type. Texas Instruments is a trusted brand for quality electronics 5 V to 15 V operating supply voltage range Other Development Tools product type 1 of 100 Development Tools as subcategory

THS6062EVM Image

THS6062EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS6062EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Other Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Driver/Receiver
  • Tool Is For Evaluation Of: THS6062
  • Brand: Texas Instruments
  • Operating Supply Voltage: 5 V to 15 V
  • Product Type: Other Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

THS6062EVM

THS6062EVM Specifications

THS6062EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Driver/Receiver.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V to 15 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Other Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top