THS7368EVM

Mfr. #: THS7368EVM
制造商: Texas Instruments
描述: Amplifier IC Development Tools THS7368EVM Eval Mod
生命周期: 制造商新产品。
数据表: THS7368EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS7368EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Video Amplifiers type. 2.7 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

THS7368EVM Image

THS7368EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS7368EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Video Amplifiers
  • Tool Is For Evaluation Of: THS7368
  • Operating Supply Voltage: 2.7 V to 5 V
  • Series: THS7368
  • Brand: Texas Instruments
  • Operating Supply Current: 24.5 mA
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

THS7368EVM

THS7368EVM Specifications

THS7368EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Video Amplifiers.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.7 V to 5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Amplifier IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top