TLC59282EVM-118

Mfr. #: TLC59282EVM-118
制造商: Texas Instruments
描述: LED Lighting Development Tools TLC59282 Eval Mod
生命周期: 制造商新产品。
数据表: TLC59282EVM-118 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLC59282EVM-118 Overview

This product is manufactured by Texas Instruments. Evaluation Modules Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.282144 oz of Unit Weight

TLC59282EVM-118 Image

TLC59282EVM-118

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLC59282EVM-118 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Series: TLC59282
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.282144 oz

TLC59282EVM-118

TLC59282EVM-118 Specifications

TLC59282EVM-118 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is LED Lighting Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.282144 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top