TLV320DAC3100EVM-U

Mfr. #: TLV320DAC3100EVM-U
制造商: Texas Instruments
描述: Audio IC Development Tools TLV320DAC3100EVM-U Eval Mod
生命周期: 制造商新产品。
数据表: TLV320DAC3100EVM-U 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV320DAC3100EVM-U Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.063020 oz of Unit Weight

TLV320DAC3100EVM-U Image

TLV320DAC3100EVM-U

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV320DAC3100EVM-U Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N/A
  • Series: TLV320DAC3100
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.063020 oz

TLV320DAC3100EVM-U

TLV320DAC3100EVM-U Specifications

TLV320DAC3100EVM-U FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.063020 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top