TLV70018EVM-503

Mfr. #: TLV70018EVM-503
制造商: Texas Instruments
描述: Power Management IC Development Tools TLV70018EVM-503
生命周期: 制造商新产品。
数据表: TLV70018EVM-503 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV70018EVM-503 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Linear Voltage Regulators type. 2 V to 5.5 V Input Voltage Output Voltage is 4.8 V Dimensions of 2 mm x 2.1 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 7.539986 oz of Unit Weight

TLV70018EVM-503 Image

TLV70018EVM-503

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV70018EVM-503 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Linear Voltage Regulators
  • Tool Is For Evaluation Of: TLV70018
  • Input Voltage: 2 V to 5.5 V
  • Output Voltage: 4.8 V
  • Dimensions: 2 mm x 2.1 mm
  • Series: TLV70018
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 7.539986 oz

TLV70018EVM-503

TLV70018EVM-503 Specifications

TLV70018EVM-503 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Linear Voltage Regulators

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2 V to 5.5 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 4.8 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 2 mm x 2.1 mm

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 7.539986 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top