TMP007EVM

Mfr. #: TMP007EVM
制造商: Texas Instruments
描述: Temperature Sensor Development Tools Evaluation Module
生命周期: 制造商新产品。
数据表: TMP007EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP007EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the IR Thermopile Sensor type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TMP007EVM Image

TMP007EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP007EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: IR Thermopile Sensor
  • Tool Is For Evaluation Of: TMP007
  • Operating Supply Voltage: 3.3 V
  • Series: TMP007
  • Brand: Texas Instruments
  • Interface Type: I2C, SPI
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TMP007EVM

TMP007EVM Specifications

TMP007EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is IR Thermopile Sensor.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, SPI.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Temperature Sensor Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top