TMP100EVM

Mfr. #: TMP100EVM
制造商: Texas Instruments
描述: Temperature Sensor Development Tools TMP100 Eval Mod
生命周期: 制造商新产品。
数据表: TMP100EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP100EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TMP100EVM Image

TMP100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP100EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: N
  • Brand: Texas Instruments
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TMP100EVM

TMP100EVM Specifications

TMP100EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Temperature Sensor Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top