| Mfr. #: | TMP108EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Temperature Sensor Development Tools TMP108 EVAL MOD |
| 生命周期: | 制造商新产品。 |
| 数据表: | TMP108EVM 数据表 |


This product is manufactured by Texas Instruments. Evaluation Boards 1.8 V, 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.024355 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP108EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V, 3.3 V
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is I2C, USB.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 125 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Temperature Sensor Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.024355 oz