TPA2010D1EVM

Mfr. #: TPA2010D1EVM
制造商: Texas Instruments
描述: Audio IC Development Tools TPA2010D1 Eval Mod
生命周期: 制造商新产品。
数据表: TPA2010D1EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA2010D1EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 5 V to 15 V operating supply voltage range Output power: 2.5 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.001966 oz of Unit Weight

TPA2010D1EVM Image

TPA2010D1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2010D1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA2010D1
  • Operating Supply Voltage: 5 V to 15 V
  • Output Power: 2.5 W
  • Series: TPA2010D1
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.001966 oz

TPA2010D1EVM

TPA2010D1EVM Specifications

TPA2010D1EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V to 15 V

  • A: At what frequency does the Output Power?

    Q: The product Output Power is 2.5 W.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.001966 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top