TPA2035D1EVM

Mfr. #: TPA2035D1EVM
制造商: Texas Instruments
描述: Audio IC Development Tools TPA2035D1EVM
生命周期: 制造商新产品。
数据表: TPA2035D1EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA2035D1EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 2.5 V to 5.5 V operating supply voltage range Output power: 2.75 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA2035D1EVM Image

TPA2035D1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2035D1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA2035D1
  • Operating Supply Voltage: 2.5 V to 5.5 V
  • Output Power: 2.75 W
  • Series: TPA2035D1
  • Brand: Texas Instruments
  • Operating Supply Current: 2.5 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA2035D1EVM

TPA2035D1EVM Specifications

TPA2035D1EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.5 V to 5.5 V

  • A: At what frequency does the Output Power?

    Q: The product Output Power is 2.75 W.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top