TPA3107D2EVM

Mfr. #: TPA3107D2EVM
制造商: Texas Instruments
描述: Audio IC Development Tools TPA3107D2EVM
生命周期: 制造商新产品。
数据表: TPA3107D2EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3107D2EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 10 V to 26 V operating supply voltage range Output power: 15 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA3107D2EVM Image

TPA3107D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3107D2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3107D2
  • Operating Supply Voltage: 10 V to 26 V
  • Output Power: 15 W
  • Series: TPA3107D2
  • Brand: Texas Instruments
  • Operating Supply Current: 4 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA3107D2EVM

TPA3107D2EVM Specifications

TPA3107D2EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 10 V to 26 V.

  • A: At what frequency does the Output Power?

    Q: The product Output Power is 15 W.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top