| Mfr. #: | TPS2066EVM-293 |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | Switch IC Development Tools TPS2066EVM-293 Eval Mod |
| 生命周期: | 制造商新产品。 |
| 数据表: | TPS2066EVM-293 数据表 |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB Switches type. Texas Instruments is a trusted brand for quality electronics 2.7 V to 5.5 V operating supply voltage range Switch IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.162030 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2066EVM-293 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is USB Switches.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 2.7 V to 5.5 V.
A: What is the Product Type of the product?
Q: The Product Type of the product is Switch IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.162030 oz