TPS22958EVM

Mfr. #: TPS22958EVM
制造商: Texas Instruments
描述: Power Management IC Development Tools TPS22958EVM
生命周期: 制造商新产品。
数据表: TPS22958EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22958EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 600 mV to 5.5 V Input Voltage Output Voltage is 5.5 V Bulk packaging for easy dispensing Output current: 4 A/6 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 105 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.046056 oz of Unit Weight

TPS22958EVM Image

TPS22958EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22958EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS22958
  • Input Voltage: 600 mV to 5.5 V
  • Output Voltage: 5.5 V
  • Packaging: Bulk
  • Output Current: 4 A/6 A
  • Series: TPS22958
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 105 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.046056 oz

TPS22958EVM

TPS22958EVM Specifications

TPS22958EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Load Switches

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 600 mV to 5.5 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 5.5 V.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 4 A/6 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 105 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.046056 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
Top